2021
TEDDY HUB | TEDDY GROUP HEADQUARTERS
Office and Logistic building for the TEDDY Group Headquarters
- Construction design assistance,
- Building permits,
- Integrated engineering in BIM,
- Safety and security project
Client
T&M Properties SpA for Teddy SpA
Intervention typology
Construction
Project Area
INDUSTRY, LOGISTICS, HEADQUARTERS
Value
18 Million €
Location
GATTEO
Years
2018-2021
Concept Design
TEKNE
Numbers
Surfaces
29 500 m2 – Gross floor area
Certifications and Sustainability Goals
Credits
In partnership with
SIMCO Consulting (Consulente Logistica)
The project for the new Logistic Hub for the textile label Teddy is part of a development plan, promoted by private initiative, which involves the creation of a new logistic platform in the municipality of Gatteo (Rimini). The intervention also envisages the realization of important urbanization works, especially designed to make the roadway network capable of supporting new traffic volumes in the area, mitigating the impacts on the town. From this point of view, special emphasis is placed on green buffers, created to shield noise, and retain dust. The warehouse, for which the design of the mechanization is under study, will have a total surface of about 27.500 sqm, and in the future it will be possible to expand further, thanks to a large lot adjacent to the one currently subject to intervention. The structures will be completely prefabricated and will be on a high podium. Along the southern front, an office building, with additional 2.000 square meters, will feature the various management divisions, as well as meeting facilities, conference rooms and a canteen.