top of page

2021

TEDDY HUB | TEDDY GROUP HEADQUARTERS

Office and Logistic building for the TEDDY Group Headquarters

- Construction design assistance,
- Building permits,
- Integrated engineering in BIM,
- Safety and security project    

interno.jpg

Client

T&M Properties SpA for Teddy SpA

Intervention typology

Construction

Project Area

INDUSTRY, LOGISTICS, HEADQUARTERS

Value

18 Million €

Location

GATTEO

Years

2018-2021

Concept Design

TEKNE

Numbers

Surfaces
29 500 m2 – Gross floor area

Certifications and Sustainability Goals

Credits

In partnership with

SIMCO Consulting (Consulente Logistica)

The project for the new Logistic Hub for the textile label Teddy is part of a development plan, promoted by private initiative, which involves the creation of a new logistic platform in the municipality of Gatteo (Rimini). The intervention also envisages the realization of important urbanization works, especially designed to make the roadway network capable of supporting new traffic volumes in the area, mitigating the impacts on the town. From this point of view, special emphasis is placed on green buffers, created to shield noise, and retain dust. The warehouse, for which the design of the mechanization is under study, will have a total surface of about 27.500 sqm, and in the future it will be possible to expand further, thanks to a large lot adjacent to the one currently subject to intervention. The structures will be completely prefabricated and will be on a high podium. Along the southern front, an office building, with additional 2.000 square meters, will feature the various management divisions, as well as meeting facilities, conference rooms and a canteen.

bottom of page