2015
MANIFATTURE BERLUTI
Offices, factory and warehouse
- Architectural and structural design assistance,
- MEP design,
- Bill of quantities,
- Fire safety design plan,
- Assistance for tender contract,
- Construction supervision,
- Safety and security plan
Client
Berluti SA
Intervention typology
Construction and Fit-out
Project Area
INDUSTRY, LOGISTICS
Value
12.5 Million €
Location
FERRARA
Years
2012-2015
Concept Design
Philippe Barthélémy & Sylvia Griño
Numbers
Surfaces
8k m2 – gross surface
Certifications
Credits
Photo courtesy by Philippe Barthélémy & Sylvia Griño
In collaboration with
The Manifattura Berluti in Ferrara aims to be a center of excellence, where high quality production technology can be developed and made known. The project consists of a new building that houses - along with spaces for production and logistics - workshops, offices and reception areas.
According with this program, the project collects the different units in a single volume - mainly on one floor - providing a division into three main areas:
-Offices and reception area;
-Production;
-Logistics.
The organization of the units meets the needs for logistics and production, in order to ensure both the flow of people and goods and the best environmental and living conditions for the staff. The division between these macro-zones is marked by internal distribution channels and land-marks placed on the roof.
In particular, the central courtyard, which is the main area of conviviality, marks the main axis of the whole structure. Internally the quality of the fit out, also for the factory area, is kept very high in order to provide to the visitor and to the work force with the mission of quality of the brand . The building is designed at the high BREEAM standard and the comfort inside is provided through a multi-zone HVAC system.