2015

MANIFATTURE BERLUTI

Offices, factory and warehouse

- Architectural and structural design assistance,
- MEP design,
- Bill of quantities,
- Fire safety design plan,
- Assistance for tender contract,
- Construction supervision, 
- Safety and security plan 

interno.jpg

Client

Berluti SA

Intervention typology

Construction and Fit-out

Project Area

INDUSTRY, LOGISTICS

Value

12.5 Million €

Location

FERRARA

Years

2012-2015

Concept Design

Philippe Barthélémy & Sylvia Griño 

Numbers

Surfaces
8k  m2 – gross surface 

Certifications

Credits

Photo courtesy by Philippe Barthélémy & Sylvia Griño ​

In collaboration with

The Manifattura Berluti in Ferrara aims to be a center of excellence, where high quality production technology can be developed and made known. The project consists of a new building that houses - along with spaces for production and logistics - workshops, offices and reception areas.
According with this program, the project collects the different units in a single volume - mainly on one floor - providing a division into three main areas:
-Offices and reception area;
-Production;
-Logistics.

The organization of the units meets the needs for logistics and production, in order to ensure both the flow of people and goods and the best environmental and living conditions for the staff. The division between these macro-zones is marked by internal distribution channels and land-marks placed on the roof.
In particular, the central courtyard, which is the main area of conviviality, marks the main axis of the whole structure. Internally the quality of the fit out, also for the factory area, is kept very high in order to provide to the visitor and to the work force with the mission of quality of the brand . The building is designed at the high BREEAM standard and the comfort inside is provided through a multi-zone HVAC system.