JOINT RESEARCH CENTRE - JRC 103
Construction of the new building 103 of Ispra Joint Research Centre
- General coordination,
- Concept and detailed architectural and structural design,
- Cost analysis,
-Integrated and coordinated planning
Client
EU - European Commission
Intervention typology
Construction
Project Area
OFFICES, CULTURE, INSTITUTIONS, LABORATORIES
Value
16.5 Million €
Location
ISPRA
Years
2015-2019
Concept Design
TEKNE
Numbers
Surfaces
7 600 m² – Gross floor area
Certifications
Credits
In collaboration with
The restructuring Intervention has seen the demolition of an entire commercial building and the reconstruction “in silhouette” of a new building to house offices, laboratories, warehouses, training centre and after-sales centre. The constraint to reconstruction in respect of pre-existing volumes has been conjugated with the specific needs of the new functional program, resulting in a realization of high technological content that is rooted in the following principles:
- access to a new “centre of gravity”, from which easily all functional areas could be served, architecturally defined by a “cut” in the volume of the building at the junction point between the two wings;
- A new facade with a movable perforated outer skin, to optimize energy savings and shield the view from the outside to the inside;
- An extended presence of green roofs on roofs and terraces, made accessible also to improve the welfare of those who work; - Maximum flexibility of the interior space, changed over time depending on the needs.
One aspect of increased complexity of the project was linked to the structural solutions, with regard to the smallness of the site area and the execution of new underground in adherence to existing buildings. From the point of view of plant equipment, in addition to energy efficiency issues, a relevant aspect is represented by the need to perform high precision machining, which has required special care so that the vibration control of the filtering system of the plants of ‘air.