2017
PRYSMIAN GROUP ITALIA HEADQUARTERS
Nuovo complesso per uffici alla Bicocca di Prysmian Group
- Construction supervision and accounting,
- MEP and structures management,
- Safety supervision during works
Committente
Prysmian Group SpA
Tipologia di intervento
Riqualificazione urbana e costruzione
Destinazione d'uso
OFFICES, HEADQUARTERS
Valore dei Lavori
45 Million €
Luogo
MILANO
Periodo
2014-2017
Concept Design
Maurizio Varratta Architetto
Numeri
Superfici
22 000 sqm –SLP
Certificazioni e Obiettivi sostenibilità
Credits
Photo Courtesy by Prysmian and Maurizio Varratta Architetto
In collaborazione con
SCE Project (Structural design)
Manens TIFS ( MEP design and LEED certification process)
GAE Engineering (Fire Prevention)
Italiana Costruzioni SpA (Contractor)
The project concerns the construction of new buildings on a brown-field, within the area called “Ansaldo”, in the historical industrial district of Bicocca. The new complex, to house the offices of the new Headquarter Prysmian, will consist of three buildings, intended for offices, services and associated activities, joined by two “Serre”: glass-ceiling spaces for connections and internal mobility and characterized by the presence of hydroponic gardens and pools of water, which contribute to the overall control of the microclimate.
Through the creation of the “Serre” the offices will get benefits of natural daylight, as well as best overall energy performance. These green “oasis”, totally accessible, will significantly contribute also to the improvement of working comfort conditions. The coverage of the “Serre” will be formed by a slopedbuffered structure with aluminum frames and windows; the flaps facing North will favor the natural lighting, without heat, and will be equipped with doors and tailgate mechanically regulated in order to favor, in the summer season, the natural cooling. The flaps facing south will be characterized by the presence of adjustable louvers, in extruded aluminum, mechanically controlled by a light detector, so as to reduce and contain the direct solar radiation. The plans also consider to build an additional block, on the North-East face, intended to house the communication and training divisions; this block will occupy the first three levels of pre-existing spinning tower, with meeting rooms and support spaces. From the point of view of the construction methods, the design module allows you to think of a quick and clean construction site, based on prefabrication and assembly of pre-finished elements, as a kind of great “Meccano”.